IIUM Repository

The successful implementation of TPM in conjunction with EOM and 5S: a case presentation

Ahmed, Shamsuddin and Mohiuddin, A. K. M. (2005) The successful implementation of TPM in conjunction with EOM and 5S: a case presentation. Journal of Applied Sciences, 5 (5). pp. 938-951. ISSN 1812-5662 (O), 1812-5654 (P)

[img] PDF (Journal Paper) - Published Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company.

Item Type: Article (Journal)
Additional Information: 3628/1219
Uncontrolled Keywords: TPM, EOM, 5S, major losses, implementation, case studies
Subjects: T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering.
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): Kulliyyah of Engineering > Department of Mechanical Engineering
Depositing User: Prof. Dr. A K M Mohiuddin
Date Deposited: 15 Aug 2011 10:40
Last Modified: 15 Aug 2011 10:41
URI: http://irep.iium.edu.my/id/eprint/1219

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year