Ahmed, Shamsuddin and Mohiuddin, A. K. M. (2005) The successful implementation of TPM in conjunction with EOM and 5S: a case presentation. Journal of Applied Sciences, 5 (5). pp. 938-951. ISSN 1812-5662 (O), 1812-5654 (P)
PDF (Journal Paper)
- Published Version
Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company.
Item Type: | Article (Journal) |
---|---|
Additional Information: | 3628/1219 |
Uncontrolled Keywords: | TPM, EOM, 5S, major losses, implementation, case studies |
Subjects: | T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering. |
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Engineering > Department of Mechanical Engineering |
Depositing User: | Prof. Dr. A K M Mohiuddin |
Date Deposited: | 15 Aug 2011 10:40 |
Last Modified: | 15 Aug 2011 10:41 |
URI: | http://irep.iium.edu.my/id/eprint/1219 |
Actions (login required)
View Item |