Ahmed, Shamsuddin and Mohiuddin, A. K. M. (2005) The successful implementation of TPM in conjunction with EOM and 5S: a case presentation. Journal of Applied Sciences, 5 (5). pp. 938-951. ISSN 1812-5662 (O), 1812-5654 (P)
| ![[img]](http://irep.iium.edu.my/style/images/fileicons/application_pdf.png) | PDF (Journal Paper)
 - Published Version Restricted to Repository staff only Download (1MB) | Request a copy | 
Abstract
Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company.
| Item Type: | Article (Journal) | 
|---|---|
| Additional Information: | 3628/1219 | 
| Uncontrolled Keywords: | TPM, EOM, 5S, major losses, implementation, case studies | 
| Subjects: | T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering. | 
| Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Engineering > Department of Mechanical Engineering | 
| Depositing User: | Prof. Dr. A K M Mohiuddin | 
| Date Deposited: | 15 Aug 2011 10:40 | 
| Last Modified: | 15 Aug 2011 10:41 | 
| URI: | http://irep.iium.edu.my/id/eprint/1219 | 
Actions (login required)
|  | View Item | 
 
	
	 Download Statistics
 Download Statistics Download Statistics
 Download Statistics