Optimal operation of multi-reservoir systems for increasing power generation using a seagull optimization algorithm and heading policy

Ehteram, Mohammad and Banadkooki, Fatemeh Barzegari and Fai, Chow Ming and Moslemzadeh, Mohsen and Sapitang, Michelle and Ahmed, Ali Najah and Irwan, Dani and El-Shafie, Ahmed (2021) Optimal operation of multi-reservoir systems for increasing power generation using a seagull optimization algorithm and heading policy. Energy Reports, 7. pp. 3703-3725. ISSN 2352-4847

[img]
Preview
PDF (SCOPUS) - Supplemental Material
Download (491kB) | Preview
[img] PDF (Article) - Published Version
Restricted to Repository staff only

Download (6MB) | Request a copy

Abstract

Power supply is a key issue for decision-makers. The reservoir operation of multi-reservoir systems is an important aspect to consider in efforts to increase power generation. This research studies a multi-reservoir system comprising of the Khersan-I (KHI), Karoon-III (KAIII) and Karoon-IV (KAIV) with the intent being to increase power generation. To achieve this, the Two-Point Heading Rule was integrated with a new optimization algorithm, namely the Seagull Optimization Algorithm (SEOA). The Two-Point Heading Rule was used based on four distinct scenarios, namely Two-Point Heading Rule (1), Two-Point Heading Rule (2), Two-Point Heading Rule (3) and Two-Point Heading Rule (4). The Seagull Optimization Algorithm was then used to find two heading parameters of the TPHRs. The Seagull Optimization Algorithm was subsequently benchmarked against the Salp Swarm Algorithm (SSA), Bat Algorithm (BA) and the Shark Optimization Algorithm (SOA). Various inflow scenarios consisting of the first inflow scenario (dry condition), the second inflow scenario (normal) and the third inflow scenario (wet condition) were considered for the optimal operation of this multi-reservoir system. The results indicated that the global solution of the MSOO based on NLP for Two-Point Heading Rule (1) under the first inflow scenario and was 3.22 while the average solution of Seagull Optimization Algorithm, Salp Swarm Algorithm, Shark Optimization Algorithm, and Bat Algorithm in respective order was 3.25, 3.93, 4.87 and 6.03. The results indicated that the global solution of the MSOO based on NLP for Two-Point Heading Rule (1) under the second inflow scenario was 2.14 while the average best solution of Seagull Optimization Algorithm, Salp Swarm Algorithm, Shark Optimization Algorithm, and Bat Algorithm in respective order was 2.16, 2.98, 3.96, and 4.89. It can be concluded that the SEOA outperformed all of the other algorithms. It was also found that the SEOA based on the Two-Point Heading Rule (3) under the third inflow scenario provided the most power generation for the KHI and KAIV systems. A multi-criteria decision was utilized to choose the best algorithm and heading policy. The ensuing results indicate that the SEOA had the best performance out of all the algorithms based on Two-Point Heading Rule (3) and the third inflow scenario.

Item Type: Article (Journal)
Additional Information: 10109/91430
Uncontrolled Keywords: Seagull Optimization Algorithm, Multi-reservoir operation, Heading policy, Power generation
Subjects: Q Science > QA Mathematics > QA76 Computer software
T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering. > T57 Applied mathematics. Quantitative methods. Operation research. System analysis
T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering. > T58.5 Information technology
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA170 Environmental engineering. Sustainable engineering
T Technology > TA Engineering (General). Civil engineering (General) > TA329 Engineering mathematics. Engineering analysis
T Technology > TD Environmental technology. Sanitary engineering > TD201 Water supply for domestic and industrial purposes
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): Kulliyyah of Engineering
Kulliyyah of Engineering > Department of Civil Engineering
Depositing User: Dr Dani Irwan Masbah
Date Deposited: 10 Aug 2021 23:50
Last Modified: 10 Aug 2021 23:50
URI: http://irep.iium.edu.my/id/eprint/91430

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year