Adesta, Erry Yulian Triblas and Riza, Muhammad and Al Hazza, Muataz Hazza Faizi and ., Rosehan (2008) The Development of Cost Structure for High Speed Hard Turning. International Journal of Science Engineering and Technology, 1 (2). pp. 47-58. ISSN 1985-3785
This is the latest version of this item.
PDF
- Published Version
Restricted to Repository staff only Download (267kB) | Request a copy |
Abstract
High speed hard turning is a new approach that attracts manufacturing firms due to its several advantages, especially for its economical aspects. A development towards a new technological approach shall usually be followed by its economic justification. One of the most effective tools to carry out an economic justification is by development of a cost structure. It may be regarded as an effective tool for decreasing the cost of uncertainty which is usually associated with new technologies. In machining process such as turning, there are many factors that affect the cost. This paper discusses two of these factors which have the higher effect on the high speed hard turning cost. Firstly, the machining cycle time which may be regarded as the most important factor that affect the cost because of its direct relationship with machine cost rate. Secondly, the tool life which is the element that affected by different cutting parameter (feed, depth of cut, cutting speed, work piece material, and tool material). The objective of this research is to highlight these two important factors and the need for developing a generic cost structure for high speed hard turning. These relationships were studied by simulating the machining time for high speed hard turning using Mathlab Simulink® allowing the operator and the manufacturer to calculate rapidly the critical values of machining time as well as helping them in determining the optimum parameters that gives the best results in high speed hard turning.
Item Type: | Article (Journal) |
---|---|
Additional Information: | 5515/27884 |
Uncontrolled Keywords: | Cost, High Speed Hard Turning, Model |
Subjects: | T Technology > TS Manufactures |
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Engineering |
Depositing User: | Dr Muataz Hazza Alhazza |
Date Deposited: | 07 Jun 2013 18:16 |
Last Modified: | 07 Jun 2013 18:18 |
URI: | http://irep.iium.edu.my/id/eprint/27884 |
Available Versions of this Item
- The Development of Cost Structure for High Speed Hard Turning. (deposited 07 Jun 2013 18:16) [Currently Displayed]
Actions (login required)
View Item |