IIUM Repository

Accelerated new factory certification using CE methodology

Mohiuddin, A. K. M. and Quick, Wee Hock (2004) Accelerated new factory certification using CE methodology. In: 2nd International Industrial Engineering Conference (IIEC-2004), 19-21 December, 2004, Riyadh, Kingdom of Saudi Arabia.

[img] PDF (International Conference Paper) - Published Version
Restricted to Repository staff only

Download (151kB) | Request a copy

Abstract

The present paper has demonstrated how Copy EXACTLY! (CE) methodology could be utilized to ramp-up manufacturing capacity within a shortest time possible and concurrently developing fundamental competencies, equivalent to that of any established sites. Everything that might affect the process is to be copied down to the finest detail. The current demands for shifting of manufacturing sites to low cost regions - necessitate the needs for a proven model for a fast and effective start-up and technology transfer. The operational and simulation models have, from time to time - proven to be a forerunner in streamlining business process, reducing product time to market and developing sustainable competitive advantage.

Item Type: Conference or Workshop Item (Full Paper)
Additional Information: 3628/1720
Uncontrolled Keywords: Technology transfer, Copy EXACTLY!, new factory start-up, factory certification
Subjects: T Technology > T Technology (General)
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): Kulliyyah of Engineering
Kulliyyah of Engineering > Department of Mechanical Engineering
Depositing User: Prof. Dr. A K M Mohiuddin
Date Deposited: 12 Sep 2011 09:18
Last Modified: 12 Sep 2011 09:18
URI: http://irep.iium.edu.my/id/eprint/1720

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year