Ayob, Mohd Fairullazi (2019) Life cycle cost (beginning) to procurement managers. In: Program Latihan Jabatan Kerja Raya Malaysia 2019 : Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3), 5th- 8th August 2019, Alor Gajah, Melaka.. (Unpublished)
PDF (Invitation letter)
- Supplemental Material
Restricted to Repository staff only Download (590kB) | Request a copy |
|
PDF (Training slides)
- Presentation
Restricted to Repository staff only until 1 October 2019. Download (2MB) | Request a copy |
Abstract
Appointed as A Speaker/Trainer by Public Works Department to provide one day training/lecture to Procurement Managers from all around Malaysia under Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3): Program Latihan Jabatan Kerja Raya Malaysia 2019.
Item Type: | Conference or Workshop Item (Lecture) |
---|---|
Additional Information: | 6985/74171 |
Uncontrolled Keywords: | Life Cycle Cost, Beginning, Awareness |
Subjects: | T Technology > T Technology (General) > T55.4 Industrial engineering.Management engineering. T Technology > TA Engineering (General). Civil engineering (General) > TA177.4 Engineering economy T Technology > TA Engineering (General). Civil engineering (General) > TA190 Management of engineering works T Technology > TH Building construction |
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Architecture and Environmental Design Kulliyyah of Architecture and Environmental Design > Department of Quantity Surveying |
Depositing User: | IR. DR. MOHD FAIRULLAZI AYOB |
Date Deposited: | 20 Sep 2019 12:06 |
Last Modified: | 20 Sep 2019 12:07 |
URI: | http://irep.iium.edu.my/id/eprint/74171 |
Actions (login required)
View Item |