The assessment of waste segregation exercise among Malaysian contractors: a descriptive analysis

Zainon, Nurshuhada and Myeda, Nik Elyna and Abu Bakar, Aniza and Loo, Siaw Chuing and Mohd Rahim, F.A. and Al Sadat Zyed, Zafirah and Samsul Harumain, Yong Adilah and Lim, Ming Zun (2022) The assessment of waste segregation exercise among Malaysian contractors: a descriptive analysis. Journal of Design and Built Environment, 22 (1). pp. 72-87. ISSN 1823-4208 E-ISSN 2232-1500

[img] PDF - Published Version
Restricted to Repository staff only

Download (549kB) | Request a copy
[img]
Preview
PDF (SCOPUS) - Supplemental Material
Download (487kB) | Preview

Abstract

Construction waste that emerges from construction sites has become a major global concern due to its negative carbon footprint on the environment. Due to underrepresented construction waste specific data in Malaysia, this paper aims to identify sources, causes, types of construction waste and decision-making factors of construction waste management in Malaysia's construction sites. A questionnaire survey was administered to 60 construction practitioners representing different construction sites in Peninsular Malaysia. A descriptive analysis using the Relative Importance Index (RII) was used to rank the items asked in the survey and categorised them into high (RII>70%), medium (50%<RII<70%) or low (RII<50%) importance levels. The findings show that the top-ranked sources of construction waste categorised as high importance level are demolition, site clearance, and refurbishment. The causes, insufficient construction waste management plan, incorrect materials, design changes, over-ordering, errors in the contract document, and on-site technical errors are ranked as highly important. The top common waste materials include concrete, brick, metal, wood, glass and paper. The importance of all decision-making factors is high-rated; unexpectedly, environmental impact is the least important reason for construction waste management contractors. The results provide a perspective of the current practices of construction waste in Malaysia. The outcome is useful for waste managers and policymakers in developing potential waste management strategies for a more sustainable construction industry.

Item Type: Article (Journal)
Uncontrolled Keywords: Malaysia, construction waste, waste segregation, decision-making factors, construction site
Subjects: T Technology > T Technology (General)
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): Kulliyyah of Architecture and Environmental Design
Depositing User: Dr. Aniza Abu Bakar
Date Deposited: 11 Oct 2022 09:14
Last Modified: 11 Oct 2022 09:14
URI: http://irep.iium.edu.my/id/eprint/100464

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year