IIUM Repository

Browse by Email

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 2.

Sohu, Samiullah and Md Kassim, Tahara Ramadzan and Sohu, Najamuddin and Loganathan, Karthikeyan (2024) Critical factors affecting cost and time overrun of construction projects in Pakistan. International Journal of Sustainable Construction Engineering and Technology, 15 (4). pp. 221-232. ISSN 2180-3242 E-ISSN 2600-7959

Sohu, Samiullah and Md. Kassim, Tahara Ramadzan and Khan, Omar Shahid and Bhatti, Sajjad Ahmed and Sohoo, Arslan Ahmed (2024) Influential time and cost factors for commercial projects in the Malaysian construction industry. Engineering, Technology & Applied Science Research, 14 (3). pp. 14170-14174. ISSN 2241-4487 E-ISSN 1792-8036

This list was generated on Mon Apr 28 19:08:02 2025 +08.