IIUM Repository

Risk assessment on plan layout for project mechanical workshop in Politeknik Kuching Sarawak

Sukindar, Nor Aiman and Ab Tahir, Aliff (2018) Risk assessment on plan layout for project mechanical workshop in Politeknik Kuching Sarawak. In: 3rd National Research and Innovation Conference (NRICon2018), 19th September 2018, Kuching, Sarawak.

[img] PDF (Proceeding) - Published Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Risk Assessment is very important to ensure safety in every aspect including operation, activities, plan layout and many more. The responsibilities to ensure the safety and health at the workplace lie with those who create the risk and with those who work with the risk. This study analyzes and identifies all possible hazards related to the plan layout in the Mechanical department’s project workshop in Politeknik Kuching Sarawak. Analysis of risk was recorded with the HIRARC Form. The probability was measured by referring to the history, interview and also by observation. Student timetables must also be taken into consideration when determining the likelihood of risk. Some recommendations and new plan layouts for the Project Workshop were proposed to ensure the risks remains in the acceptable level.

Item Type: Conference or Workshop Item (Plenary Papers)
Additional Information: 9156/78303
Uncontrolled Keywords: Risk Assessment, Hazard, HIRARC
Subjects: T Technology > T Technology (General) > T175 Industrial research. Research and development
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): Kulliyyah of Engineering
Kulliyyah of Engineering > Department of Manufacturing and Materials Engineering
Depositing User: Dr NOR AIMAN SUKINDAR
Date Deposited: 09 Mar 2020 09:21
Last Modified: 09 Mar 2020 09:36
URI: http://irep.iium.edu.my/id/eprint/78303

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year