Santos, A. S. and Madureira, A. M. and Varela, M. L. R. and Putnik, G. D. and Emrul Kays, H. M. and Karim, A.N. Mustafizul (2015) Scheduling and batching in multi-site flexible flow shop environments. In: 2015 10th Iberian Conference on Information Systems and Technologies (CISTI), 17th-20th June 2015, Aveiro, Portugal.
PDF
- Published Version
Restricted to Repository staff only Download (2MB) | Request a copy |
||
|
PDF
Download (462kB) | Preview |
Abstract
Global competition and the customers demand for customized products with shorter due dates, marked the introduction of the Extended Enterprise. In this Extended Manufacturing Environment (EME), lean, virtual, networked and distributed enterprises collaborate to respond to the market demands. In this paper we study the influence of the batch size on Flexible Flow Shop makespan minimization problem FFc||Cmax for two multi-sites approaches, the FSBF (Flow Shop Based Factories) and the PMBF (Parallel-Machines Based Factories). The computational study demonstrates how the performance of the PMBF model decreases with the increase of batch size and determines the batch sizes in which the performance is similar.
Item Type: | Conference or Workshop Item (Invited Papers) |
---|---|
Additional Information: | 4289/48778 |
Uncontrolled Keywords: | Extended Manufacturing Environment; Flow Shop Based Factories; Parallel-Machines Based Factories; Multi-Site Flexible Flow Shop; Batching. |
Subjects: | T Technology > TS Manufactures > TS155 Production management |
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Engineering > Department of Manufacturing and Materials Engineering |
Depositing User: | Prof. Dr. A. N. Mustafizul Karim |
Date Deposited: | 15 Feb 2016 14:25 |
Last Modified: | 25 Sep 2017 11:12 |
URI: | http://irep.iium.edu.my/id/eprint/48778 |
Actions (login required)
View Item |