Sohu, Samiullah and Md Kassim, Tahara Ramadzan and Mustafa, A. and Arshad, M. U. and Nagapan, Sasitharan (2024) Assessing the causes and effects of delay and disruption in construction projects in Malaysia. Journal Of Applied Engineering Sciences, 14 (27/ Issue 2). pp. 336-341. ISSN 2247-3769 E-ISSN 2284-7197
PDF
- Published Version
Restricted to Registered users only Download (473kB) | Request a copy |
Abstract
Construction projects often face challenges while execution such as delays and disruptions. Thus, Research studies are being carried out to managing the potential risks such as technical, economical, legal, social, commercial, financial, resource and construction that might arise from delays as well as from disruptions. The prime aim of this research is to identify the causes and effects on construction projects due to delays and disruptions. For the data collection, a descriptive study designed to obtain causes that effected construction projects due to delays and disruptions from regulatory bodies clients, consulting and construction firms. Relative importance index (RII) methodology is utilized for identification of important parameters related to delay and disruptions. In this study random sampling technique are utilized for selection of respondents. For data collection literature review and questionnaires survey techniques are received from respondents. The results obtained from this research study revealed that poor project management, funding problems, design changes, delay in payment to contractors, information delays, disagreement on the valuation of work done and compensation issues are identified as main causes for delays and disruptions. In addition to that, the results mentioned that, major effects include cost overrun, time overrun, negative social impact, disputes and idling resources due to delays and disruptions. The study summarizes that there are few causes that effected delays and disruptions that put projects at risk and impacted on project performance. Therefore, it is suggested that prime focus should be kept on sufficient budget of construction, timely issuing of information, design completion and rational project management skills during procurement processes for betterment.
Item Type: | Article (Journal) |
---|---|
Additional Information: | 9230/117346 |
Uncontrolled Keywords: | Causes, Effects, Delays Construction Projects, Disruption of a Project. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Kulliyyahs/Centres/Divisions/Institutes (Can select more than one option. Press CONTROL button): | Kulliyyah of Engineering > Department of Civil Engineering |
Depositing User: | Tahara Ramadzan Md Kassim |
Date Deposited: | 31 Dec 2024 10:29 |
Last Modified: | 31 Dec 2024 10:29 |
URI: | http://irep.iium.edu.my/id/eprint/117346 |
Actions (login required)
View Item |